History

1941Established as Toyo Kanetsu Kogyo K.K. Began production and sales of industrial furnaces
1950Began Storage Tank Business
1953Established conveyor factory in Yokohama
1958Fabrication Shop certified by API (American Petroleum Institute)
1968Became a member of API
1969Completed installation of Distribution Center for the retail industry
Changed the company name to Toyo Kanetsu K.K. (TKK)
1970Registered as a listed company at Primary Stock Exchanges in Tokyo
1971Established Chiba Plant, the largest production capacity with its 200,000M2 land area and 350-meter long wharf
1974Established Joint Venture Company, P.T. Toyo Kanetsu Indonesia
1978Completed construction of four units of 128,000M3 above ground double wall LNG Storage Tanks in Arun, Indonesia
1981Completed the first Digital Picking System in Japan
1989Began Architectural Engineering
1990Completed the latest Case Sorting and Handling System at New Tokyo Post Office
1991Celebrated the 50th Anniversary
1992Established Joint Venture Company, Toyo Kanetsu (Malaysia) SDN.BHD.
Installed baggage handling system for Terminal 2 at New Tokyo International Airport (Narita)
1994Plant & Machinery Division awarded ISO 9001 Certificate
1998Completed the world's largest Baggage Handling System at Kuala Lumpur International Airport in Malaysia
Completed installation of automatic picking system for cigarettes
1999Material Handling System Division awarded ISO 9001 Certificate
2000Completed one unit of 180,000M3 Full Containment Pre-stressed Concrete Wall Above Ground LNG Storage Tank in Osaka, Japan
Logistics Grand Prix awarded by The Japan Institute of Logistics Systems
2001The Architectural Engineering Section became Architecture & Housing Division
2002The Material Handling Division became the independent subsidiary company of Toyo Kanetsu K.K. as Toyo Kanetsu Solutions K.K.
Entered into Strategic Business Alliance with Siemens Dematic. Created Toyo Kanetsu Solutions K.K., a logistics solution provider
2005Plant & Machinery Division awarded JAPEIC-PCC Certificate of welding management process to manufacture (weld) the Electrical Facilities defined in the Japanese Electricity Utilities Industrial Law.
2006Completed one unit of 188,000M3 Full Containment Pre-stressed Concrete Wall Above Ground LNG Storage Tank in Darwin, Australia